SSSWG
January 1998 Minutes
Preliminary Meeting Minutes for January 1998
IEEE Storage Systems Standards Working Group (P1244)
Held at Caesar's Palace, Las Vegas, NV January 13-15, 1998
----------------------------------------------------------------------
IEEE Sponsor Merritt Jones
SSSWG Chair Jack Cole
Technical Editor Sam Coleman
Co-Treasurer Joel Williams
SSSWG Site Geoff Peck
Attendance (10).
----------------------------------------------------------------------
Curtis Anderson SGI curtis@sgi.com
Jack Cole ARL jack.cole@ieee.org
Dixon Hutchinson EXABYTE hutch@exabyte.com
Merritt Jones MITRE merritt@mitre.org
John Merrill NCAR jhm@ucar.edu
Geoff Peck QUANTUM geoff@sgi.com
David Richey QUANTUM richey@richey.com
Alan Rollow DEC alan@nabeth.cxo.dec.com
Hamid Vazire HP vazire@cup.hp.com
Joel Williams SES joel.williams@ses-inc.com
Administrative.
----------------------------------------------------------------------
The meeting began at 8:30 am on Tuesday with the usual business of
attendance and registration. Minutes from the Santa Fe meeting were
approved along with the agenda for this meeting. The meeting ended
at noon on Thursday.
POINTS of DISCUSSION
("MMS" = "Media Management System")
----------------------------------------------------------------------
MMS Requirements (DRAFT, Sam Coleman)
----------------------------------------------------------------------
Sam was unable to attend this meeting. In his place, the group
reviewed the requirements through section 3, and Geoff captured changes
in a version "5.1".
After completing part of the review, the group revised its release
target for the Requirements slightly to February 1st, recognizing that
meeting the target depends on a lot of review and re-writing after the
meeting.
The group agreed on a common set of "terms" it uses in the
Requirements and Architecture documents.
Data Model (Curtis Anderson)
----------------------------------------------------------------------
Curtis, with contributions from Joel and Geoff, produced a revised
presentation of the OpenVault data model. After reviewing a third or so
of the new document, much of the group felt that a detailed examination
could better take place offline.
MMS Architecture (DRAFT, Geoff Peck)
----------------------------------------------------------------------
This was a review of a slightly newer version of the draft of the
MMS architecture document, to include the common set of terms accepted
earlier in the meeting.
The group is determined to polish this document sufficiently to
permit public inspection and comment by end of the March meeting.
Language Requirements
----------------------------------------------------------------------
Again, there was very little in-meeting discussion on the topic.
IEEE Project Authorization Requests (PARs)
----------------------------------------------------------------------
PARs will be developed and submitted before the February 6th deadline
for approval at the March 19th Standards Board meeting:
P1244.1 Standard for Media Management System (MMS) Architecture
P1244.2 Standard for Media Management System (MMS)
Session Security, Authentication, and Initialization Protocol
(SSAIP)
P1244.3 Standard for Media Management System (MMS)
Media Management Protocol (MMP)
P1244.4 Standard for Media Management System (MMS)
Drive Management Protocol (DMP)
P1244.5 Standard for Media Management System (MMS)
Library Management Protocol (LMP)
P1244.6 Standard for Media Management System (MMS)
Media Manager Interchange Protocol (MMIP)
P1244.7 Standard for Media Management System (MMS)
Media Manager Control Interface Protocol (MMCIP)
P1244.8 Standard for Media Management System (MMS)
C Language Procedural Interface
P1244.9 Standard for Media Management System (MMS)
User Mount Commands
P1244.10 Standard for Media Management System (MMS)
Standard Adminitrative and Operational Commands
P1244.11 Standard Data Mover for Storage Systems (MOVER)
Web site and E-Mail Reflector
----------------------------------------------------------------------
Work proceeds to fully enable reflector and web site functionality.
Action Items
----------------------------------------------------------------------
o Review revised versions of the Requirements and Architecture
Drafts, Terms and Definitions before the March meeting (ALL)
o Collect and Incorporate Reviews to the MMS Requirements (Sam)
o Arrange the March meeting in Boulder (John Merrill)
o Write/Submit PARs in time for the next IEEE approval cycle (Jack)
o Revise, Rebuild SSSWG.ORG, Reflectors (Geoff, Jack)
o Develop Language Components for MMS (Joel, Curtis)
Timeline
----------------------------------------------------------------------
Open MMS Requirements to Public Review by February 9, 1998
Submit PARs to IEEE by February 6th.
Approve, Open MMS Architecture to Public Review at March 98 Meeting
Submit MMS to IEEE Ballot Process by September 98 Meeting
Next Meeting.
----------------------------------------------------------------------
March 10-12, 1998, NCAR, Boulder, CO
Future Meetings.
----------------------------------------------------------------------
May 12-14, 1998 Milpitas, CA (Geoff Peck/QUANTUM)
July 14-16, 1998 Redmond, WA (Jonathon Otis/ADIC)